Key Project Objectives

  • To make change processes more flexible with the aim of reducing the plant's lead time in its strategic product line.
  • Train staff on continuous improvement concepts & Involve staff in every stage of the re-engineering process of change
  • Introduce the concepts of 5S, Ergonomics, SMED and Parallel Work
  • Create a reporting program that allows you to store and monitor the results.
  • Form an internal team for the management & execution of SMED projects

Methodology & Action Summary in 7 Steps

Step 1: Educate to change / open minds

Step 2: Classify / Eliminate variability

2.1 Define the Key Products

Reduction from 25 to 20 Key Products by eliminating products with low or zero production levels in 2012.

2.2 Create Change Class Matrix

Step 3: Define the Starting Point: Where are we?

Step 4: Improve the work environment

Step 5: Democratic Re-Engineering

Step 6: Monitor & Capitalize on Improvements

Step 7: Technical & Functional Improvements

  1. Elimination of the need for “Sprays” & Independence with Maintenance
  2. Mechanical Improvement of the Villars Machine
  3. Electrical Upgrade of the Villars Machine

Lean Change C2 Observations: White ->

  1. Creation of a dust deviation control program & Independence with production managers
  2. Control of those in charge through Reporting
  3. Control of those in charge through supervision of external tasks

Lean Change C2 Observations: White->White with Spray: 54 minutes

 

White with Spray

Process Re-Engineering Summary

Number of optimized processes

  • 66% of the changes observed, defined and optimized
  • 34% of the improved changes
  • Process Re-Engineering Summary

    Output1Output2Output3
    C1Previous External TasksWork sequence with 2 PAXExternal tasks post-change
    C2Previous External TasksWork sequence with 2 PAXExternal tasks post-change
    C3Previous External TasksWork sequence with 2 PAXExternal tasks post-change
    C4Previous External TasksWork sequence with 2 PAXExternal tasks post-change
    C5Previous External TasksWork sequence with 2 PAXExternal tasks post-change
    C6Previous External TasksWork sequence with 2 PAXExternal tasks post-change

    Process dossier

Summary of Actions Taken & Pending

5S Actions: Order / Cleanliness / Safety

StateCompliance%
Plan28100%
EARRINGS1760%
 Act / Implemented519%
Discarded621%

7S Actions: Ergonomics / Displacements

StateCompliance%
Plan52100%
EARRINGS510%
 Act / Implemented3975%
Discarded815%

Organizational Actions

  • Creation of the process dossier
  • Operator training
  • Definition of external work
  • Definition of Objectives

Functional Actions

  • Creation of the powder weight program
  • Training of those in charge
  • Creation of communication & reporting panels

Pending points

 

Using the powder weight program:

Control of actual weight deviation vs. target / Tray weight deviation / Digital adjustment

Outsourcing the assistant's work:

Having an additional easel for the start of production

Project Results

Analysis of the initial results regarding the implementation period

Coating Trends 2012 1

 

Evolution of changes C1 White->White

Short-term objectives for the C2 White->White Bi-Co changes.

Short-term objectives for the C3 White->White with Film changes

Short-term objectives for the C5 Black->Black changes

Summary of Results FROM 2/01/2013 TO 17/01/2013

Coating Efficiency January 2013

Short-term future

Now we can start improving!

Improvements applicable to all changes

Monitoring Results / Supporting and Motivating Operators

  • Daily review with the operators of changeover times and problems encountered.
  • Weekly review with the production manager of changeover times.
  • Weekly review of continuous improvement action plans and ongoing actions

Other opportunities for improvement

Quality controls

Today, during each type change, we have several sources of waste due to the current strict quality control process:

  • Allow uninterrupted production in cases where the production preparation process is controlled
  • Analyze uncontrolled production preparation processes
  • Having a quality control indicator on the production line

Evaluation of potential material savings with a process change
production start-up