Packaging: Business Intelligence & Lean Manufacturing
Origins: Obstacles

Main wastes identified:

Starting Point of Efficiency

Current status of the changes

Production System created & used

Lean techniques used in the project

Production Systems VS Agile Systems

Production System created

ORGANIZATION FOCUSED ON CONTINUOUS IMPROVEMENT

ORGANIZATION FOCUSED ON CONTINUOUS IMPROVEMENT

Production System created
CONTROL & KPIS: LEAN-6Sigma REPORTING

Flash results – visual management

CONTROL & KPIS: LEAN-6Sigma REPORTING

Production System created

5S & ERGONOMICS & CONSUMABLES CONTROL
BEFORE

5S & ERGONOMICS & CONSUMABLES CONTROL
Transformation Methodology

5S & ERGONOMICS & CONSUMABLES CONTROL
AFTER

Production System created

Current focus of work: Creating a production system
Moving from an organization where we rely on excellent people and mediocre processes to an organization with excellent processes and average people.

Creation of a custom-made process manager
- Consumables Ordering Processes
- Roller management processes
- Shift change reports
- Staff allocation parts
- Battery leveling control processes
- 5S Checklists / Consumables
- Autonomous Maintenance Management Modules

Planning the management tasks for each Lean technique

Production System created

Planning Management Process Map: VA /NVA

Stock generator, overproduction, waiting times, general dissatisfaction
INSTA-PLAN: Pull Flows & Shorter Lead Times

Advantages of Insta-Plan:
- Synchronization of all departments in the same Planning
- Elimination of administrative work
- Evolution of real-time planning
- Reduction of Over-production & Pull Flow throughout the company
- Reduction of Changeover Times & Start-up Losses through a Sequencing Module
- Freeing up resources to perform other tasks –
Insta-Plan Visual Planning Example: Production manager terminal

Terminal Manager of Production:
- Green light system when all raw materials are available within the production unit
- Scheduling algorithm respecting the performance of each machine and the weekly maintenance needs
- Visual alerts in case of delays in Planning –
Insta-Plan Visual Planning Example:
Internal provider terminal

Internal Provider Terminal View:
- Visual alert system in case of danger during machine entry time
- Real-time production monitoring –
Comprehensive planning and unique management
The Planning management It is vital in the industry to avoid:
- Loss of performance across the entire production system due to lack of materials
- Loss of plant performance due to poor sequencing of manufacturing orders
- Increased waste due to poor sequencing of manufacturing orders
In addition to these economic impacts, it is obvious that good planning management improves our service quality and competitiveness through the reliability of our delivery times.
Planning management in offset printing is often an obstacle course full of low-value-added tasks that saturate various company resources, diverting them from their main functions:
- Section Chief (15%->50% of time)
- Warehouse (10%-30% of time)
- Plant Coordinator (5->10% of time)
- Support Department: (FTP/ Inks / Formatting Machine / Varnish/etc…) (5%->10% of time)
Graphic Arts Example: Ink codes to reduce changeover times

Production System created

Integrate SMED into the culture

Identifying Downtime Weight Change Families

Exchange Rate Analysis

Strategy for improving the added value of personnel

LIST OF TASKS TO PREPARE

Implementation Control of Change Preparation

Production System created

Integrate Continuous Autonomous Maintenance as a culture

Insta-TPM: Importance of Autonomous Maintenance

Insta-TPM, a global management tool for Autonomous Maintenance:

Continuous Autonomous Maintenance

Insta-TPM, an easy and agile tool for selecting and assigning priority autonomous maintenance tasks

Production System created

The Visual Maintenance Plan

We have created this Maintenance Communication tool with the following objectives:
- Have a Visual Maintenance Plan
- Standardize production diagnostics
- Prioritize requests based on their impact on OEE
- To promote efficient collaboration between Maintenance & Production
- Controlling the quality of maintenance service
- Eliminate administrative work and information loss
- Improve Efficiency through Improved Maintenance
Advantages & Functions of the Visual Maintenance Plan

Perfect Maintenance: A Complex & Broad Challenge

Impact Levels of a Maintenance Request
| PARAMETERS | IMPACT LEVEL 0 | IMPACT LEVEL 1 | IMPACT LEVEL 2 | LEVEL OF IMPACT 3 |
| SPEED | It doesn't influence | Micro-stops with mild repercussions and loss of up to 1000 units/hour | Micro-stoppages with notable impact and loss of up to 1500 eq./hour | Micro-stoppages with significant repercussions and loss greater than or equal to 1500 ex. / hour Security Risks |
| STRIKES (Account double) | It doesn't influence | Stoppages with minor repercussions and/or losses of up to 5 minutes per change Breakdowns of up to 30 minutes | Strikes with significant impact and loss of up to 15 minutes per change Breakdowns of up to 45 minutes | Strikes with significant repercussions and losses greater than or equal to 15 minutes per change Breakdowns lasting more than 45 minutes Security Risks |
| DECREASE | It doesn't influence | Disturbances that involve a increased shrinkage of up to 5% the jobs | Disturbances that produce a increased shrinkage of up to 10% the jobs | Disturbances that produce a increase above 15% of the jobs Security Risks |
Current KBA Applications

Production System created

AGORA ZONE

AGORA ZONE: EFFICIENCY MANAGEMENT
EXCELLENCE IS IN THE DETAILS

AGORA ZONE: INNOVATION MANAGEMENT
THERE'S ALWAYS ROOM FOR IMPROVEMENT

AGORA ZONE: QUALITY MANAGEMENT
TODAY'S QUALITY IS TOMORROW'S FUTURE


Breakdown Tracking & Extended Downtime

RESULTS

What have we achieved?

Times of Change: Excellent

Trend Changes 2015 vs 2016

Evolution Decrease

Financial Results

Direct evaluation method (Management Controller)

INDUSTRIAL POINT OF VIEW
EXTRA HOURS TO SELL….

INDUSTRIAL POINT OF VIEW
LESS CARDBOARD TO BUY…

ANNUAL INDUSTRIAL REPORT INSTA-LEAN PROJECT
Offset section only

5-year projection
Given the stabilization of results during the last 6 months of the project and that the results of the first 6 months were modest because the project was in the implementation phase, we can estimate that the level of savings in production hours can be maintained without major new efforts in the coming years.
This allows us to make the following projection:

| YEARS | 1 | 2 | 3 | 4 | 5 |
| Accumulated savings optimistic scenario | xxx K€ | xxx K€ | xxx K€ | x.xxx K€ | x.xxx K€ |
| Accumulated savings realistic scenario | xxx K€ | xxx K€ | xxx K€ | xxx K€ | x.xxx K€ |
PRODUCTION SYSTEM AND SOFTWARE